completed jobs

Recent Jobs Completed by KD Environmental Consulting Services

Steve W

January 6, 2024 | Kerhonkson, NY

Performed Blower Door testing following ANSI/RESNET/ICC 380-2019 Standards

Kevin P

December 20, 2023 | Stone Ridge, NY

Special attention to detail was required to ensure the frame was properly set for a good seal. HERS Certified Raters are trained in challenging situations.

Michael C

September 30, 2023 | Greenwood Lake, NY

Customer was advised of the air sealing that was required to pass the test. Performed Blower Door testing following ANSI/RESNET/ICC 380-2019 Standards

Carol D.

March 4, 2023 | Walden, NY

Mold Assessment Plan report Suggestions to better insulate the pipes to prevent freezing.

F Bridges

February 11, 2023 | Stormville, NY

Performed Blower Door testing following ANSI/RESNET/ICC 380-2019

Jenna G.

February 4, 2023 | Monticello, NY

It was recommended to confirm the ridge vent is operational and air is flowing out. Air sealing will assist to reduce the amount of moisture into the attic area.

Trevor R.

January 23, 2023 | Pine Plains, NY

Performed Blower Door testing following ANSI/RESNET/ICC 380-2019

Lawrence M.

December 9, 2022 | Staatsburg, NY

Performed Blower Door testing following ANSI/RESNET/ICC 380-2019

Diahan C.

January 2, 2021 | Fishkill, NY

A complete inspection of the house and air samples were completed. All is clear and the house is considered safe to live in! Going forward I suggested additional insulation be installed in the attic to improve energy efficiency. Also to have the gutters and grading outside be observed to make ...

Total: 9