Completion date: September 30, 2023
Location: Greenwood Lake, NY
The first test failed, and further air sealing was necessary to achieve NY Standard requirements. To address this, the customer was advised of the air sealing that was required to pass the test, and Blower Door testing was performed following ANSI/RESNET/ICC 380-2019 Standards.
Dave French