Testing Blower Door

Blower Door Tests

successful blower door testing

Blower Door (new home builds)

We provide accurate testing and reporting of this standard. As of October 3, 2016, all new Residential Construction must comply with the newly mandated ACH 50 or the so-called “Blower Door “ testing requirement which assures that the code required maximum allowable air leakage is not exceeded.

NY State Building Standards and Codes – As of October 3, 2016, all new Residential Construction must comply with the newly mandated ACH 50 or the so-called “Blower Door “ testing requirement which assures that the code required maximum allowable air leakage is not exceeded.

Request Your On-Site Consultation!

We offer a Professional on-site inspection and consultation.


Fields with (*) are required.

What to Expect From Your Mold Assessor

Review the Fact Sheet from the New York State Department of Labor